Osmosis Treatment - Dec 2014 - Feb 2015

WWBeforeWorkw

 

 

 

 

Westerly Yacht in the Yard before work starts

 

 

 

 

WWAfterSandBlastw WWGelpeeledw
 Gel peel & Sand Blast done,  Moisture readings taken all over
 WWInside  WWInsideDryingw
 Yacht in the shed amongst other boats in for work  Drying out before osmosis treatment starts
 WWKeelOffw  WWSheavedplusPeelPly.1

Whilst in - Keels are taken off as leaking.  

Clean & treated with expoxy & resealed

Keels, primed & re-fitted.  

Hull sheaved with epoxy & cloth

 WWPortSideSanded.StarboardEpoxyFiller3  WWHullPrimedWeb
Starboard side epoxy filled, Port side Sanded off  Hull primed with 6 coats of Epoxy
 WWSprayed1  WWafterSpray
 In the spray tent in the process of being sprayed  Spray finished, but still masked up
 WWSprayed  WWfinished

 Un-wrapped & being polished pre Copper Coat to hull

 Complete, with new vinyl logos & copper coat bottom,

Outside & ready to launch

trout bmf logo
trout abya logo